Cost To Build A 800 Sq Ft House

Building an 800 sq. ft. house is a great way to save money and live comfortably in an environmentally friendly way. A small house can easily be built for less than $50,000 and can have everything you need for living comfortably. You’ll have a cozy living room, a kitchen with plenty of counter space and cabinets, two bedrooms and a bathroom with a shower and toilet.

The materials needed for building such a house will vary depending on the type of foundation you choose to build it on. If you decide to use concrete blocks as your foundation then you’ll need about 65 blocks per square foot that equals about 350 cubic feet of concrete blocks required for the foundation alone. The framing materials will vary depending on what kind of roofing material you choose, but if we’re talking about asphalt shingles then each roof would require about 12 rolls of shingles at approximately 3 pounds per roll or 36 pounds per square foot.

In addition to the costs associated with building materials, there are also costs associated with labor involved in constructing this type of dwelling structure – which can vary widely depending on who builds it (i.e., professional builder vs friend).

If you’re looking to build an 800 square foot house, you have a few different options. You can buy a standard, prefabricated kit home that’s all pre-built and ready for delivery. You can also hire someone to build it for you, or hire them as a general contractor and do most of the building yourself using their expertise as a guide. The question is: How much will this cost?

Cost To Build A 800 Sq Ft House

The cost to build a 800 square foot house will vary greatly depending on location, the size of the home, and the materials used. You can get a quote from a contractor or use an online cost calculator to estimate costs based on your specific needs.

Permits and Labour

Permits. You will need permits to build an 800 sq ft house, unless your municipality allows you to build without them. Permits cost money and take time to obtain, so if you don’t get them in advance, it can add up to a lot of money and time later on during construction.

Before you start the construction process for your new home, consider how long it takes for your department of building or planning office to issue permits and whether or not they’ll require an inspection before issuing a certificate of occupancy (CO). A CO is required by most lenders as proof that all work has been completed safely and according to code, so this document could be very important when buying insurance or refinancing your mortgage later on down the road.

Debris Removal

>Debris removal is included in the cost of your project. If you want to remove the debris yourself, it will take about two days to complete. If we do it for you, we can do it in about three hours.

The cost of removing the debris depends on what kind of materials your contractor uses:

If they use concrete block, then we’ll need to hire a front-end loader with a grapple bucket and remove each block using a crane. This will take around nine weeks to complete if there are no delays due to weather conditions or other factors that might cause delays in construction or landscaping (such as rain). In this situation, your total cost will be $27 per square foot removed via front-end loader with grapple bucket and crane ($27/square foot).

Foundation

The foundation is the most expensive part of building a house. The foundation is the base of a house, and it must be strong enough to support the weight of your home as well as any earthquakes or other natural disasters that could occur. In addition to being sturdy and durable, foundations are also designed according to local codes depending on where you live. For example, if you live in an earthquake-prone area like California, then your foundation will need to withstand more than someone living in Alaska would need to withstand with their own foundations.

Despite being the most costly part of any home construction project, many people overlook this essential feature until it’s too late and they find themselves paying for more repairs after their home has already been built (and perhaps even moved into).

Site Preparation

Most building projects begin with site preparation. This includes grading, excavation and paving. The cost of these services will vary significantly depending on the scope of your project, but in general you can expect a 10% increase for each additional 3,000 square feet. If you’re installing mature landscaping or paving over an existing surface, add another 5%.

You may also need to install some utilities such as sewer lines to accommodate your construction needs. If you are doing a lot of site preparation work yourself (e.g., digging out a basement), this is an added cost that should be accounted for in your budgeting process.

Structure Steel

If you are looking to build your own home, steel framing might be the best method. Steel framing is the most common method of construction used in commercial buildings and houses today. The cost of steel framing depends on the size and type of house that is being built as well as whether it will be used for commercial or residential purposes. If you are building a home on a budget, consider using steel instead of traditional construction methods because it could save you thousands of dollars in labor costs over time.

Concrete

However, the cost of concrete is also dependent on the size and shape of your foundation. Concrete is also used in footings, slabs and pads for buildings. A concrete sidewalk or patio can add to your costs as well.

Building Materials

You will need the following building materials for your new 800 sq ft house:

  • Foundation Materials – These include the foundation, footings and retaining walls. You can choose from concrete foundations, poured concrete or precast foundation systems.
  • Structure Materials – These include framing lumber, nails and screws. Other materials you may need include headers, siding panels and windows.
  • Roofing/Siding/Gutter/Sheet Metal Flashing – You will also need shingles or asphalt tiles for your roofing material; cedar shakes or composite shakes for siding; gutters made of aluminum or PVC pipe with a downspout at each corner; sheet metal flashing to cover any exposed joints between different types of materials around doors, windows and roofs

Framing (Interior & Exterior)

The cost of framing depends on the size of your home. While the exterior framing is more expensive than interior framing, it also includes roofing, walls and flooring. Interior framing covers walls, ceiling and flooring. If you’re building an 800-square-foot house, expect to pay about $8 per square foot for both interior and exterior framing costs.

Doors, Windows, Trimwork and Cabinetry

There are a lot of things to consider when building a house. From the foundation to the roof, there are many different materials that you need to put into your home.

One of these materials is doors and windows. These items should be considered carefully because they can make or break the appearance of an entire room.

If you want to save money on these items, it’s important that you do some research before buying them so that they will fit in with the rest of your home while still being affordable.

You should also keep in mind that if something breaks down later on down by paying less money upfront now could just mean spending more money later on when repairs need fixing.

Roofing/Siding/Gutters/Sheet Metal Flashing

Roofing and siding are two of the most expensive parts of your house. Roofs can cost as much as $2 per square foot, while siding is often priced at $3-$6 per square foot. Guttering and sheet metal flashing are also quite expensive, at $1-$4 each.

Roofing usually consists of asphalt shingles (which cost around $5-$8 per square foot), but you can choose to go with tile or wood instead—both options will be pricier than asphalt shingles. Asphalt shingle roofs have four sides and a ridge line that runs from east to west; they’re easy to install by anyone who’s had basic training in construction skills or carpentry. Siding is typically made from wood, there are plenty of different types out there for you to choose from.

Electrical Work

Electrical work is a big part of building a house. If you have an electrician do the work, expect to pay about $4,000 for a 200-amp system and about $6,000 for a 400-amp system. If you hire an electrician who will also pull permits and take care of code compliance issues—as well as perform all tasks related to wiring—the cost will be closer to $8,500.

If you want to save money by doing your own electrical work, remember that it’s dangerous: there are live wires involved. A handyman might charge between $10 and $15 per hour for this type of work (and may not even be licensed). But if you’re handy with tools yourself and feel comfortable working with electricity professionally (or at least safely), then perhaps this option is best for you. Of course there are always risks no matter who does it; if something goes wrong with your wiring installation or installation process, it could cost thousands more in labor costs later on down the line when repairs need making after they’ve been finished improperly—so plan ahead carefully before embarking on such tasks yourself.

The cost to build a 800 sq ft house is $20,000 – $30,000.

When it comes to the cost of building a house, there are many factors that go into determining how much you will be spending on your new home. The size and type of material used, as well as the location where you build can all affect this figure. But the most important factor to consider is whether or not you are paying someone else to build your home for you or if you plan on doing some or all of it yourself.

The average cost per square foot for building materials has risen slightly over time but remains fairly low compared with other countries such as Australia or New Zealand; however there are many factors that may increase these costs such as choosing premium building materials if applicable (such as high-quality flooring) which would result in higher upfront costs but could save money later down the road due less repairs needed throughout its lifespan – thereby making those initial costs worth their weight in gold. Or perhaps splurging on an expensive kitchen with granite countertops would make sense given how often food spills happen while cooking.

Conclusion

The cost to build a 800 sq ft house will vary depending on where you live, what kind of home you’re building and how much work you do yourself. It also depends on whether or not you buy a pre-fabricated kit home or hire a builder to construct your home from scratch.